The Arbors At Dogwood Creek

 


As noted in The Arbors at Dogwood Creek deed restrictions (CC & R'S) all construction in this subdivision is subject to approval of the Arbors Architectural Control Committee including, but not limited to, new homes, out buildings, room additions, fences, patios, pools, decks, and mailboxes.

The plans for such construction must be submitted and approved in advance of beginning work.


 

Pre-Plan Approval Requirements:
 



Before a plan is submitted for approval on a lot, the lot may have other types of activity in preparation for the building project to begin. Activity may include but is not limited to: perk tests, lot clearing, and utility installation.

 

The following policies apply to pre-plan activities:
 


A. ACCESS: If the lot is to be accessed by trucks or large equipment for lot clearing, perk tests or other pre plan activities, the owner must submit for and receive approval for the installation of the temporary driveway to be used to access the lot for the duration of the project until the permanent driveway is installed.

 

B. DRIVING OVER THE RIGHT-OF-WAY:  the 60 foot road right-of-way, measured from one lot pin - across the roadway - to the opposite lot pin is arbors Association property. for erosion protection of association property, this right-of-way may not be driven across nor parked on; lot access must only occur across the temporary driveway, which must be properly installed before pre-plan activities begin. Access to any lot across the right-of-way that damages the right-of-way, in any way, will result in a fine for the lot owner.

C. PARKING ON THE RIGHT-OF-WAY: Parking of vehicles of any sort is allowed within 2 feet of the pavement. Parking is never allowed past the two feet allowed on the right-of-way, which occupies the space between the pavement and the owners lot. Damage to the right-of-way, in any way, will result in a fine for the lot owner.

D. FIRES: No unattended burning on any lot is allowed. If lot clearing includes burning the cleared materials, the owner or a builder representative must remain on site until the fire is completely out. Unattended burning on any lot will result in a fine for the lot owner.

 

thank you for complying to these rules. they have been designed to protect your, and everyone else's, investment in this community!
 


 

Please visit our Architectural committee page for more information...

 

the following agreement must be signed by homeowner and builder before a construction plan is approved:

Compliance Agreement

 

*********

What is needed for Plan Approval?

(PRINTABLE PDF FILE)

*********

QUICK REFERRAL: 

Subdivision Culvert sizes

********

********

 

Please send plans to:

 

Pioneer Property Management

611 S. Congress #510

Austin, Tx 78704

512-443-3757